Ingerop Logo
Infrastructure
Underground structures

Champigny-sur-Marne Cut and Cover

Ile-de-France
Design and supervision
Customer
Ile-de-France Interdepartmental Road Directorate (DIRIF)
Place
Champigny-sur-Marne

Types of service

Construction management

As part of the road tunnel Safety measures, in accordance with Circular 2000-63, DIRIF has entrusted INGEROP for design and work supervision for the safety of the Champigny sur Marne cut-and-cover tunnel. This mission follows the definition of the improvement programme and elements of the Safety Dossier in 2003-2004.

CHARACTERISTICS

  • Urban tunnel with 2 unidirectional tubes of 750 m and 780 m, with 4 lanes and high traffic, on the A4 motorway
  • Works with maintenance of the operation
  • Co-activity with 4 other transverse construction management on the site (supervision overhaul, DAI video and physical closures, self-evacuation, radio, etc.)

 

Civil engineering works:

  • Emergency exits and new safety and fire niches creation
  • Facilities for disabled people
  • N2 or N3 fire protection of structures and networks
  • Redevelopment of technical rooms and ventilation plants

 

Equipment works:

  • Resumption of High Voltage (HTA) distribution (new HTA link between substations), refurbishment of technical premises with modification of HTA switchboards and securing of Low Voltage.
  • Renovation of the ventilation system (longitudinal system with accelerators in the south and semi-crosswise in the north)
  • Complete overhaul of the lighting installations in the 2 tubes and installation of beaconing studs
  • Redesign of the fire network

 

SIRIUS network routing

Complete overhaul of the Centralised Control Management (CTM), interfacing with the general overhaul programme for the supervision of the 22 Ile-de-France tunnels